The Center for Irrigation Technology (CIT)
at California State University,
Fresno conducted tests to determine clogging resistance of the screen
design of Ore-Max 16mm 1 GPH emitterline. The Center for Irrigation
Technology is the official industry testing laboratory for drip irrigation
products. The test protocol used is a
variation of the standard CIT emitter grit test, modified to double the
total loading of grit. This modified test protocol has been used in
successfully developing 2 GPH Ore-Max emitterline to achieve maximum
clogging resistance. This severe test, using a wide spectrum of grit sizes,
was necessary in order to pick up differences in design of the Ore Max
emitter, which is much more resistant to clogging than other emitters.
1 GPH Max Emitters are unique in that they have 185 screen openings over
330 degrees on the inside surface of the emitter leading to the flow path.
This makes it very difficult to clog the water entry point. The new
design 1 GPH Max-Emitter utilizes the same number of screen openings but improves on the
original by making the openings smaller. The screen openings are reduced
from .040” x .040” to .040” x .020”. The smaller screen openings reduce the
size and amount of material that can enter the emitter flow path, further
reducing the possibility of clogging.
The standard CIT test includes adding measured samples of standard sized
aluminum oxide grit, in sequence, to a fixed amount of circulating water
with pressure and temperature controlled. A test sample of emitterline with
20 emitters is part of the circulation system. Each grit size added
increases the concentration by 250 PPM. The double grit test uses grit
sizes 240, 220, 180, 150, 120, 100, 80, 70, 60, 54 and 46. The total
concentration by the end of the test is 5500 PPM. The grit numbers
correspond to particles that will pass through sieves from 140 mesh to 30
mesh. During the course of the test, flow measurements were taken after
grit additions. After all the grit had been added and measurements taken,
the grit was filtered from the circulating water and another flow
measurement taken with clean water circulating.
|
Emitter model
|
Emitters in test
|
Gph/Cv
clean water
|
End of test no. plugged
|
Gph/Cv working emitters 5500 ppm grit
|
No. emitters plugged after cleaning water
|
Gph/Cv working emitters after cleaning water
|
|
16mm 1 GPH small screen design
|
20
|
1.05/.02
|
1 (5%)
|
1.04/.02
|
0
|
1.04/.02
|
The tests show the new small screen design Max-Emitters are even more
resistant to clogging under severe contaminant loads than the original
design Max-Emitter. Not only is the percentage clogged very low but the
remaining working emitters are extremely uniform, operating at normal flow
rates. After two complete grit test cycles only one of the Max-Emitters was
plugged and it cleared itself once clean water was flushed through the test
system. Most emitters will completely plug during the first cycle of tests
as the tests were designed to determine at what point an emitter will plug.
The comment was made the Max-Emitter performed better than any emitter ever
tested by CIT.
The unique design of the 16MM 1GPH Max-Emitter makes it possible to
obtain the maximum distribution uniformity of heap leach mining solutions,
even under heavy contaminant loading with low flow rate emitters.
Copies of the test data are available click here or contact The Center
for Irrigation Technology, California State University. Test sponsored by
Wade Mfg. Co.
Click here for Actual 1 GPH Test Results
Double Grit Test Videos

Ore-Max emitters installed and
operating with grit load |

Collection chute after test
solution has passed through emitters |

Adding more grit to the test
solution |

Adding more grit to the test
solution |

Adding more grit to the test
solution |

Collection chute showing grit
building up on edges from the emitters |

Test solution dripping from
emitters |

Test solution dripping from
emitters |

Test solution captured in clear
container |

Collection chute with grit load
|
|
|
Double Grit Test Photos

Test solution dripping from emitters
|

Test solution dripping from emitters
|

Test solution dripping from emitters
|

Test solution dripping from emitters
|

Grit being added to solution |

Test solution dripping from emitters
|

Test solution dripping from emitters
|

Test solution dripping from emitters
|

Test solution captured in clear container
|

Heavy grit load from emitters in
collection chute |

Test solution captured in clear container
|
|
This Summary written by Ore-Max
|